Running the job
An inspection nobody did. An injury nobody reported. A permit nobody closed.
On the job, and on the record
The things that have to be done on site, and the record that they were done. A briefing is signed on the phone by the people who were there, a permit runs its fire watch down in front of them, and an incident is written at the scene rather than remembered at the office on Monday.
Hot work, closed properly
The fire watch, counted down on the phone
A hot work permit is closed through its fire watch: an hour’s watch after the torch goes off, then a final check an hour later, with the phone counting the time down.
- Precautions tickedBefore the permit is issued, and the holder signs to accept it.
- Hot work endsThe torch goes off and the fire watch starts.
- An hour’s watchCounted down on the phone.
- A final check, an hour laterThen the permit closes.
The clock above is shown speeded up: an hour in fifteen seconds.
- Inspections and observationsStatutory checks with when each is next due, the quality checks beside them, and what has been seen and not yet put right.
- IncidentsRecorded at the scene, with whether they are reportable under RIDDOR and by when.
- RAMS, briefings and permitsRAMS with site briefings signed on the phone, toolbox talks, and permits to work with a timed fire watch after hot work.
The running program on a sample company. The firm, its jobs, its people and every figure are invented.
Not on sale yet
Register your interest
Murgese Construction is in final testing. Tell us about your firm and we will come back to you when it is on sale, with a date and a price rather than a newsletter.